Glazed façade installation at M3 Wolverhampton
M3, Wolverhampton / 01Curtain-wall installation in progress

Independent manufacturer + installer / Est. 1992

Commercial glazing, precisely carried through.

Aluminium windows and bi-folds, façade glazing, shop fronts, balustrades, powder coating and project support—from first estimate through manufacture and installation.

MBE at a glance

01Established
1992
02Structure
Independent manufacturer + installer
03Project route
Estimate / design / make / install
04Clients
Architects / contractors / developers / facilities teams

Enhanced-security door fabrication, independently certified.

MBE holds BSI Kitemark™ product certification for the fabrication of selected enhanced-security aluminium doors to BS 4873:2016 and PAS 24:2022 under certificate KM 811944.

Scope note / doors

The certified scope applies only to eligible door products and configurations. Suitability is confirmed during estimating.

See certification and approvals

Built on service from start to finish.

An enquiry is reviewed by estimating before technical design, manufacture and installation are coordinated to the agreed scope. It is a practical route through the work, not a hand-off between disconnected suppliers.

How MBE works
MBE team installing a full-height aluminium-framed glazed opening
Aluminium glazing / installation
Interface note / 01

Early project information makes estimating and coordination more useful.

Different roles. One clear route in.

A.01

Architects & specifiers

Bring MBE into the conversation while grids, interfaces and system requirements can still be coordinated. Current technical data is supplied only against the live project brief.

A.02

Main contractors & developers

Use one route from enquiry and estimating through design coordination, manufacture and completed installation—defined around the project scope and programme.

A.03

Facilities & maintenance teams

Send details of the existing entrance, glazing or door issue to MBE's internal reactive-maintenance team. The service operates 24 hours a day, seven days a week across mainland UK, with attendance agreed for each requirement.

From brief to building.

The exact programme varies. The underlying route stays legible.

  1. 01

    Enquiry

    Share the brief, drawings, location and programme.

  2. 02

    Estimating

    The available information is reviewed to define and cost the scope.

  3. 03

    Technical design

    Requirements and construction interfaces are coordinated.

  4. 04

    Manufacture

    Products are manufactured in house from aluminium lengths to ready-to-fit assemblies.

  5. 05

    Installation

    Site activity is planned with the wider project team.

  6. 06

    Support

    Completion, repair or maintenance needs are handled to the agreed scope.

Interior view towards a glazed commercial entrance at Sawtry services
Commercial entrance / Sawtry services

Entrances do not stop at handover.

MBE accepts repair and preventative-maintenance enquiries for glazing, doors and associated systems through its internal reactive-maintenance team. The service operates 24 hours a day, seven days a week across mainland UK, with attendance agreed for each requirement.

Independent since 1992.

MBE Glazing Systems Ltd was founded in 1992. The company's established proposition is simple: connect estimating, technical design, manufacture and installation around commercial glazing work.

Read about MBE

Project enquiry / ENQ-01

Tell us what the building needs.

Share the project stage, location and glazing requirement. MBE can then direct your enquiry to the right estimating or support conversation.

Project brief

Required field

Useful details include the project stage, approximate scope and any programme constraints. Do not include sensitive information.

To include drawings, schedules or photographs, email them to sales@mbeglazing.co.uk.