Company / founded 1992

An independent route through commercial glazing.

MBE brings estimating, drawing-office support, in-house manufacture and installation together for architects, contractors, developers and facilities teams.

Built on service from start to finish.

MBE Glazing Systems Ltd was founded in 1992. It is an independent manufacturer and installer serving offices, retail, leisure, public buildings, industrial projects and selected residential work across mainland UK.

Products are manufactured at MBE's Elland premises, from extruded aluminium lengths through to completed, ready-to-fit assemblies. Installation is completed by MBE's own fitting team, with repairs and maintenance handled around the clock by an internal reactive team.

In-house MBE glazed aluminium frame assembly
In-house frame assembly / Elland

Door fabrication within a defined, certified scope.

MBE's BSI Kitemark™ certification covers the fabrication of selected enhanced-security aluminium doors within its approved scope. It is the company's lead product certification.

Enhanced Security of Doors

Credential
BSI Kitemark™ certification
Certified scope
Fabrication of selected enhanced-security aluminium doors
Certificate
KM 811944
Standards
BS 4873:2016 / PAS 24:2022
First issued
23 June 2025

Certification applies to eligible products and configurations within MBE's approved manufacturing scope. Requirements are reviewed during estimating before a certified solution is confirmed.

Designed, made and fitted by MBE.

  1. 01

    Estimate

    MBE's sales team reviews the enquiry and prepares the estimate. Surveys and estimating are available without charge.

  2. 02

    Develop the drawings

    The draughtsman and drawing office coordinate the agreed design and relevant construction interfaces.

  3. 03

    Manufacture in house

    CNC machinery and a sheet-metal workshop with laser, guillotine and press-brake capability support production at Elland.

  4. 04

    Install

    Completed products are taken through to site installation by MBE's own fitting team.

  5. 05

    Maintain

    Repair and maintenance enquiries are handled by MBE's internal reactive-maintenance team, operating 24 hours a day, seven days a week.

Aerial view of The Kay Group commercial building and its completed glazed façades
Completed commercial glazingThe Kay Group / completed glazing

Send MBE the project information you have.